Section C3 Vegetation preservation and care
The urban forest is made up of vegetation on public and privately owned land, and green infrastructure on public and private walls and buildings. It provides significant visual, ecological, environmental, social, cultural, psychological and financial benefits.
Climate change, population growth, pollution and urban heating, place pressure on the natural and built fabric of the city. A healthy urban forest plays a critical role in maintaining healthy and liveable ecosystems and places in Newcastle. Liveability greatly depends on the long-term conservation and management of existing trees, plants, shrubs, and other vegetation, and the planting of appropriate species.
This section applies to vegetation clearing that requires a permit under the State Environmental Planning Policy (Biodiversity and Conservation) 2021 (Biodiversity and Conservation SEPP), and vegetation clearing undertaken ancillary to development.
There are three potential approval pathways for the clearing of vegetation:
- Exempt
Some vegetation clearing is exempt under this DCP and can be undertaken without approval see sub-section 7.0).
- Permit application for clearing declared vegetation
A permit application will be required where declared vegetation clearing is not ancillary to other development needing consent. Declared vegetation is defined in sub-section 7.0. - Development application (DA)
The clearing of vegetation may be considered in a DA where the clearing is ancillary to other development needing consent.
The following sections may also apply to development:
Associated technical manuals:
- Newcastle Urban Forest Technical Manual, updated 2018. City of Newcastle (CN), formerly Newcastle City Council.
- Manage and care for the urban forest and maximise urban greening, resulting in a healthy, green and biodiverse city that provides economic, ecological and social benefits.
- Identify declared vegetation under the Biodiversity and Conservation SEPP.
- Provide opportunities for ecosystem pollinator habitat.
- Prioritise the retention of the existing urban forest.
- Ensure compensatory plantings are provided when vegetation is cleared.
- Protect and enhance the biodiversity and amenity value of the urban forest through the protection of trees, plants, shrubs, and other vegetation including a diversity of native and non-native vegetation in both private spaces, and along public verges, pathways, and roadways.
- Protect high environmental value land, including biodiversity corridors, riparian areas and wetlands.
- Authorise the clearing of priority weeds and other inappropriate vegetation and encourage replacement with appropriate compensatory plantings.
A word or expression has the same meaning as it has in Newcastle Local Environmental Plan 2012 (LEP 2012), unless otherwise defined. Other words and expressions include:
- Clear vegetation – has the same meaning as in Biodiversity and Conservation SEPP and includes:
- cut down, fell, uproot, kill, poison, ringbark, burn or otherwise destroy the vegetation, or
- lop or otherwise remove a substantial part of the vegetation.
- Compensatory planting - tree planting required offsetting the loss of retainable tree canopy.
- Dead tree – is where the biological function of the tree has ceased. No leaves are present and there is visible evidence of trunk, root plate and canopy desiccation.
- Declared vegetation – the following is defined as declared vegetation in accordance with Part 2.3 of the Biodiversity and Conservation SEPP, subject to the exemptions outlined in C-2 and C-3 of sub-section 7.0 Approval required: exempt, permit or development consent:
- any native vegetation that is a threatened species, endangered ecological community, or provides habitat for threatened species, or
- any tree equal to or greater than 3m in height, or with a diameter (measured at 1.4m above ground level) equal to or greater than 15cm for a single trunk tree or equal to or greater than 10cm for one of the trunks of a multi-trunk tree, or
- any shrub that is equal to or greater than 3m in height, or
- a tree that is required to be retained or planted as a condition of a complying development certificate, permit or development consent, or
- any vegetation on land managed by CN.
- Environmental land – is land retained onsite for the protection, provision or restoration of the environment; including land avoided under the 'avoid, minimise, offset' hierarchy, and riparian corridors. Environmental land can provide a range of environmental services such as biodiversity protection; waterway stability; land stability; flood attenuation; habitat enhancement, biodiversity corridors and buffers; microclimate regulation and climate resilience.
- Habitat tree - mature to over-mature trees that contains hollows or cavities.
- New residential site – is identified through land use zoning for future urban development. It has not been developed and is located outside the existing urban area.
- Native vegetation – has the same meaning as in Part 5A of the Local Land Services Act 2013and includes the following types of plants native to New South Wales:
- trees (including any sapling or shrub or any scrub)
- understorey plants
- groundcover (being any type of herbaceous vegetation)
- plants occurring in a wetland.
A plant is native to New South Wales if it was established in New South Wales before European settlement. The regulations may authorise conclusive presumptions to be made of the species of plants native to New South Wales by adopting any relevant classification in an official database of plants that is publicly accessible.
For the purposes of this part of the plan, native vegetation does not extend to marine vegetation (being mangroves, seagrasses or any other species of plant that at any time in its life cycle must inhabit water other than fresh water). A declaration under section 14.7 of the Biodiversity Conservation Act 2016 that specified vegetation is or is not marine vegetation also has effect for the purposes of this part.
- Pruning – only refers to activities covered by AS4373; Pruning of amenity trees.
- Public Tree – is a tree/shrub located on land managed by CN.
- Shrub – is a woody perennial plant that is generally smaller than a tree species at maturity and has many main stems or trunks.
- Tree – is a long lived woody perennial plant greater than 3m height (or will be at maturity), with one or relatively few main stems or trunks.
- Tree retention values – are a weighted combination of tree sustainability and landscape significance used to determine how retainable a tree/s is to guide the site analysis and site planning stages of development. Tree retention values are determined using the following three steps further outlined within the Newcastle Urban Forest Technical Manual:
- assess tree sustainability
- assess landscape significance
- weigh sustainability and landscape significance.
- Tree vacancy site – is a public land site CN has identified for future tree planting. The sites were identified from analysis of the local government area (LGA) based on criteria in the Tree Asset Management System. Tree vacancy site locations are available on request from CN and on CN's website - TreeMap.
- Urban forest – is the collection of trees, shrubs, and other vegetation types, on both public and privately owned land within the Newcastle LGA.
- Vegetation – has the same meaning as in the Biodiversity and Conservation SEPP where the term is defined as a tree or other vegetation, whether or not it is native vegetation.
Objectives
- Provide clarity on the approval pathway for vegetation clearing or pruning.
Controls (C) | Explanatory notes | ||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Declared vegetation is defined in sub-section 6.0 Definitions. There are three potential approvals pathways for the clearing/pruning of vegetation: the clearing/pruning is exempt, or the clearing/pruning requires a permit, or development consent. If the clearing/pruning of declared vegetation is not to enable development (e.g. building works), and meets one of the exemptions outlined in C-2 or C-3 below, a permit is not required from CN. If the clearing of declared vegetation is not to enable development (e.g. building works), and does not meet any of the exemptions outlined in C-2 or C-3 below, then a permit is required from CN, see sub-section 9.0 Permit for the clearing of declared vegetation. If the vegetation to be cleared is to enable development for which consent is being sought, then the clearing of vegetation is ancillary to the development and will be considered as part of the DA, see sub-section 10.0 Development consent for clearing of vegetation ancillary to a DA. The Biodiversity and Conservation SEPP prohibits CN from issuing a permit for the clearing of native vegetation that exceeds the biodiversity offsets scheme threshold. Refer to the Biodiversity Conservation Act 2016 for further information. Vegetation clearing on waterfront land may require a controlled activity approval under the NSW Water Management Act 2000. Waterfront land includes the bed, bank and all land within 40m of any river (includes watercourses), lake (includes wetlands), or estuary. See the NSW Government website for further information. | ||||||||||||||||||||||||||||||||||||||||||||||
C-2. A permit from CN is not requiredto clear declared vegetation on private land if landowners' consent has been obtained and one of the following is true:
The Report Storm Damage Tree Removal form in the Urban Forest Technical Manual is to be completed and submitted within 5 days of tree clearing, or iii. is located within 3m of the edge of a pool, or dwelling or building greater than 20m2, measured from the closest point of the trunk to the footings of the dwelling/building, or the outside edge of the coping of a legally constructed swimming pool, and is not:
c. the tree is listed in Table C3.01 and is not:
| This control does not apply to trees or shrubs on land managed by a public authority. The maintenance, pruning or clearing of trees and shrubs within road reserves or located on land managed by CN can only be undertaken by CN. If a tree or shrub on land managed by CN appears to be damaged by a storm, it must be referred to CN who will carry out the required works. Tree clearing on private land under the bushfire 10/50 rules is to be undertaken in accordance with the requirements of the NSW Rural Fire Service and does not require a CN permit. The Biodiversity and Conservation SEPP allows CN to issue a permit for the clearing of vegetation that is or forms part of a heritage item, is within a heritage conservation area or is or forms part of an Aboriginal object or is within an Aboriginal place of heritage significance only if CN is satisfied that clearing is of a minor nature, is for the maintenance of the heritage item, Aboriginal object, Aboriginal place of heritage significance or heritage conservation area and would not affect the heritage significance. See sub-section 8.0 or refer to the Biodiversity and Conservation SEPP for further information If the proposal will harm a known Aboriginal object or Aboriginal place, an Aboriginal Heritage Impact Permit will be required under the National Parks and Wildlife Act 1974. This permit is separate to a development consent or heritage minor works or maintenance notification endorsement issued by CN. It is your responsibility to obtain the permit from the relevant NSW Government Authority, separate to CN's approval process.
*Except where the tree height exceeds 10m or the trunk diameter, at 1.4m above ground level, exceeds 30cm. | ||||||||||||||||||||||||||||||||||||||||||||||
| Generally, a permit is not required for removing a small portion of a tree. As per the definition of 'clear vegetation' in sub-section 6.0 Definitions above, a permit is only required where a 'substantial' part of the tree is proposed to be removed. |
Permit Applications
Development category | Application requirements | Explanatory notes |
---|---|---|
All permit applications. | A completed permit application form.
| The application form can be found on CN's website. |
Where a declared tree is proposed to be removed. | A report prepared by a consulting arborist (AQF5) that:
|
|
Where it is proposed to clear declared vegetation that is or forms part of a heritage item, or an Aboriginal object or that is within an Aboriginal place of heritage significance. | Heritage Minor Works or Maintenance Notification form. | The Heritage Minor Works or Maintenance Notification form can be found on CN's website. If the proposal will harm a known Aboriginal object or Aboriginal place, an Aboriginal Heritage Impact Permit will be required under the National Parks and Wildlife Act 1974. This permit is separate to development consent, heritage minor works or maintenance notification endorsement issued by CN. It is your responsibility to obtain the permit from the relevant NSW Government Authority, separate to CN's approval process. |
Where it is proposed to clear declared vegetation within a heritage conservation area and visible from the street or other public areas (other than a lane). | Heritage Minor Works or Maintenance Notification form. | The Heritage Minor Works or Maintenance Notification form can be found on CN's website. |
Preparation of an ecological assessment will be required where the clearing of declared vegetation is proposed if any of the following are true:
| An ecological assessment prepared:
| Refer to the Urban Forest Technical Manual for guidance on measuring the top of bank of a CN mapped waterway. A Vegetation Management Plan may be required to be submitted with the permit application if required by the ecological assessment, or by the NSW Government to support a controlled activity approval for vegetation clearing on waterfront land. Waterfront land includes the bed, bank and all land within 40m of any river (includes watercourses), lake (includes wetlands), or estuary. See the NSW Government website for further information. Refer to the Urban Forest Technical Manual for further guidance on the preparation of Vegetation Management Plans. |
Development Applications
Development category | Application requirements | Explanatory notes |
---|---|---|
All DAs. Where one or more tree(s) are proposed to be removed. | A report prepared by a consulting arborist (AQF5) is required that:
A landscape concept plan, prepared following the Urban Forest Technical Manual, is required for the site, identifying suitable locations and species for compensatory tree plantings. The landscape concept plan should demonstrate that:
| A tree retention value assessment will be required for all trees impacted by the development together with a tree protection plan for all trees to be retained. Refer to the Urban Forest Technical Manual for further guidance on the landscape concept plan. The relevant DA forms can be found on CN's website. |
Where development includes cut or fill excavation and a tree is (including on adjoining land):
| A report by a consulting arborist (AQF5) is required that:
|
|
Where a public tree or tree vacancy site is:
| Site plans that reference:
Where the proposed development design, including driveway crossovers, is within the public tree protection zone (defined in accordance with AS 4970-2009), the DA must demonstrate how the feasibility of alternative design options to retain the tree were considered. All alternative design options that were considered should be outlined and a feasibility review provided for each option. | Further information on site plans can be found in the Urban Forest Technical Manual.
|
Preparation of an ecological assessment will be required if any of the following are true:
| An ecological assessment that is prepared:
| The NSW Government's criteria for high environmental land are outlined in the Hunter Regional Plan 2041. In accordance with the High Environmental Value Strategic Planning Mapping and Governance Guide, threatened ecological communities not in moderate-good condition or highly disturbed may be excluded from an avoidance area. Threatened ecological communities are considered to be in moderate - good condition if they have a current vegetation integrity score greater than or equal to 60 (this score is consistent with the Biodiversity Assessment Method 2020 Operational Manual - Stage 3 definition of a security benefit). Refer to the Urban Forest Technical Manual for guidance on measuring the top of bank of a CN mapped waterway. |
Preparation of a Vegetation Management Plan will be required if any of the following are true:
| A Vegetation Management Plan prepared:
| A Vegetation Management Plan may also be required by the NSW Government if the proposed clearing is a controlled activity under the Water Management Act 2000. Controlled activities refer to work or actions on waterfront land. Waterfront land includes the bed, bank and all land within 40m of any river (includes watercourses), lake (includes wetlands), or estuary. See the NSW Government website for further information. |
Subdivision of a new residential site. | A detailed site plan(s) (and report) prepared in accordance with the Urban Forest Technical Manual that identifies:
A report from a consulting arborist (AQF5) outlining the impacts on all trees within five meters of the proposed development, including adjacent lots, to specify the protection proposed for trees to be retained, and justify any tree clearing. The report is to be prepared in accordance with the Urban Forest Technical Manual and shall include the following:
| The requirements of this clause are in addition to the other Development Application requirements outlined in sub-section 8.0 Application requirements. That is, a DA for the subdivision of a new residential site will be required to submit the information in this clause, in addition to the above DA requirements outlined in sub-section 8.0 Application requirements. |
Objectives
- Ensure vegetation clearing sustains and increases vegetation and canopy cover on an intergenerational basis.
- Avoid any negative impact of pruning on trees.
- Provide guidance for compensatory measures to replace any vegetation proposed to be removed.
Controls (C) | Explanatory Notes |
---|---|
C-1. Where it is proposed to clear declared vegetation, a permit application is to include a completed application form (see CN's website) and the associated permit application requirements as outlined in sub-section 8.0 Application requirements above. | Associated permit application requirements may include the preparation of an Arborist Report, Heritage Minor Works and Maintenance Notification form, an ecological assessment, site plans and any other information requested by CN. This permit process may apply to land managed by public authorities other than CN, where the public authority’s relevant legislation does not provide for tree clearing. |
C-2. All pruning, including that which would be considered clearing, must be undertaken in accordance with AS4737-2007. | |
C-3. Trees are to be retained wherever possible. A permit application must demonstrate that at least one of the tree assessment tests under the Urban Forest Technical Manual has been met. | |
C-4. Vegetation management for the purposes of bushfire risk management is to be accommodated within the site, not through the clearing, adjustment, or management of vegetation on land managed by CN. | |
C-5. Compensatory tree planting is to be undertaken in accordance with the Urban Forest Technical Manual. | |
C-6. The location of compensatory trees on private land is to consider the location of services and other infrastructure. |
Objectives
- Ensure that vegetation clearing sustains and maximises canopy cover on an intergenerational basis.
- Ensure existing vegetation is identified and assessed in the development process.
- Ensure retention of trees on existing lots is undertaken in a responsible manner.
- Minimise potential development impacts on areas of high environmental value.
- Provide guidance for compensatory measures to replace any vegetation proposed to be removed.
- Ensure that no net-loss of tree vacancies occurs through the consideration of public tree vacancy sites in the design of the development.
- Ensure existing public trees are retained except where it can be demonstrated that no practical alternative is available.
Controls (C) | Explanatory Notes |
---|---|
C-1. Where the clearing of vegetation is being undertaken ancillary to development that requires consent, a DA is to include the relevant DA forms (see CN's website) and the associated development application requirements as outlined in sub-section 8.0 Application requirements above. | Associated development application requirements may include the preparation of Arborist Reports, Heritage Minor Works and Maintenance Notification form, an ecological assessment, a Vegetation Management Plan, site plans, public tree site plans and any other information requested by CN. |
C-2. All proposals will be designed to retain trees wherever possible. |
|
C-3. Trees retained as part of a development consent are to be protected in accordance with the tree protection plan, during the demolition and construction phase. | Further information on Tree Protection Plans can be found in the Newcastle Urban Forest Technical Manual. |
C-4. Vegetation management for the purposes of bushfire risk management or Crime Prevention Through Environmental Design must be accommodated within the site, not through the clearing, adjustment or management of vegetation on land managed by CN. | Vegetation management for private benefit cannot be imposed on land managed by CN. |
C-5. Where it is demonstrated that the development design cannot retain all trees, the following outcomes are preferred:
|
|
C-6. Where the clearing of native vegetation is being undertaken for the purpose of a subdivision:
| This control defines a position for the avoidance and protection of high environmental land, consistent with criteria and strategies outlined in the Hunter Regional Plan 2041. The control applies to all native vegetation clearing for the purpose of a subdivision and will be applied when determining the appropriate local level of avoidance for development that triggers the Biodiversity Offset Scheme. In accordance with the High Environmental Value Strategic Planning Mapping and Governance Guide, threatened ecological communities not in moderate-good condition or highly disturbed may be excluded from the avoidance area. Threatened ecological communities are considered to be in moderate - good condition if they have a current vegetation integrity score greater than or equal to 60 (this score is consistent with the Biodiversity Assessment Method 2020 Operational Manual - Stage 3 definition of a security benefit). |
C-7. Public tree and vegetation management activities including maintenance, pruning and clearing can only be undertaken by CN. | Vegetation management to gain site access or to stockpile materials or spoil requires written consent from CN. |
C-8. Prioritise the retention of public trees and tree vacancy sites through the design of a development proposal, including:
| Contact CN to obtain location/s of tree vacancy sites or visit the CN website. Refer to Newcastle tree map where tree vacancy sites are referred to as "potential trees". CN will specify the tree protection requirements for public trees that are to be retained as part of the conditions of consent. An application to CN under Section 138 of the Roads Act 1993 is required for clearing or pruning of public trees ancillary to complying development proposed under State Environmental Planning Policy (Exempt and Complying Development Codes) 2008. |
C-9. If a tree vacancy site, or a public tree, is removed as a result of the development proposal, a fee will be charged in accordance with relevant fees and charges for compensatory planting at a ratio of 2:1, see the Urban Forest Technical Manual for further information. | Fees and charges are outlined in Delivering Newcastle. The Urban Forest Technical Manual outlines the methodology to ensure compensatory trees support an increase in canopy cover with maturity. |
C-10. When planning the location and type of a utility connection, avoid requiring the clearing or pruning of public trees, or preventing the future planting of tree vacancy sites. | Contact Ausgrid for assistance when planning to connect a property to power. |